SUMMER CLOSURES
Posted on May 22nd, 2012
- Replacing the electrical service from Pelican Bay Blvd. to the south beach facilities.
- Repairing the concrete pilings that support the south boardwalk.
- Restoring the eroding slope at the south berm which will require excavation work.
- Repairing the electrical line from the transformer to the north beach facilities.
At this point the timing, means, methods of approaching all four of these projects has yet to be determined. But as we know more, we will continue to inform you. We will make every attempt to coordinate the work in such a way to minimize any inconvenience to the membership. We do not expect access to the beach to be impacted at the north beach location, however we do expect closures of the south berm and/or south boardwalk throughout this process.